Shreck Hydro system, near Alamosa, Colorado

  • 2 kW pelton wheel off-grid hydroelectric system
  • 110 feet of head
  • 200 gpm flow

The hydroelectric system was installed for a client to provide power and energy for a remote cabin site. The turbine was placed in a vault to protect it from vandalism and freezing. The controls are in an existing building. Excess energy is burned off has heat for the garage after batteries are charged.

Read the Case Study